Stages & Concerts
Stages & Concerts
On April 9, 2016, the iFAN Festival took place in the Kreienbaum-Halle in Warendorf near Münster. This festival premiere is an indoor music festival. The moderation of the evening was taken over by the fashion designer and blogger Victoria van Violence. At 5:00 pm, the party started and among the headliner Prince Pi, there were Kapelle Petra, Radio Havanna, Arising, Itchy Poopzkid, and Abandon Hope around.
L&S supported the organizers with their expertise and offered a full service of stage construction, sound and lighting technology. The preparations lasted a year. The technicians put the different bands into scene as well as they provided the right sound.
The “musik: landschaft westfalen” offers visitors an experience of classical music and the arts, encounters and culinary specialties on six festival weekends. The Parklandschaft Westfalens serves as the place of the concerts. This area is remarkable due to its landmarks, its architecture and its attractions.
In August 2014, the great Kammerphilharmonie [chamber philharmonic] St. Petersburg, together with the MLW Festival Choir, hosted the Wasserschloss in Raesfeld. L & S supplied a 140 m² stage, lighting technology and the necessary transmission and sound technology for classical orchestras.
The special sound equipment in particular was very popular with our customers and the guests, and there were quiet a few. Our team focuses, concerning sound equipment and technology on a Line- Array-System KIVA of the French manufacturer L ‘Acoustics, microphones from Neumann and Sennheiser and mixing console technology from Yamaha.
“Krach am Bach” was launched for the first time in 1994 and can now look back on a successful vita. Now means after 21 years. 22 bands from the area of alternative, indie rock and hardcore played at the festival site in Beelen, near Warendorf. The proceeds of the open air festival are donated to non-profit organizations and projects and now count more than 200,000 euros.
Already for the fifth time, the organization team from Krach am Bach trusted L&S as a professional service provider for stage, lighting and sound engineering. L&S delivered both stages and the entire event technology. The two-day event was supervised by our technicians.
In July 2014, the 33rd Abifestival took place in the old nuclear power plant in Lingen / Ems. L&S celebrated another episode of the Umsonst & Draußen Open Air with about 14,000 festival enthusiastic visitors. At tropical temperatures of more than 30 degrees, the volunteer fire brigade provided here and then the necessary cooling. More than 20 rock bands played within two days.
L&S supplied an 80 m² stage with extensive additions. A total of 130 m² of play and work space were available. The complete sound and lighting technology was also provided by our company.
L&S lieferte eine 80 m² große Bühne mit umfangreichen Anbauten. Insgesamt standen 130 m² Spiel- und Arbeitsfläche zur Verfügung. Auch die komplette Ton- und Lichttechnik stammte aus unserem Hause.